Studebaker Road St. Improvements
OE provided inspection services to the City of Cerritos on this 1 mile long Studebaker Road Rehabilitation Project. The project limits spanned Studebaker Road from South Street north to Artesia Boulevard. The project was federally funded, and required compliance with the Caltrans’ Local Assistance Procedures Manual (LAPM). The scope of work included rehabilitation along Studebaker Road of 2” cold milling and overlay. The construction work included removal and replacement of damaged and uncompliant curb and gutter, sidewalk, and access ramps. Furthermore, the paving work was done at night between 10:00 pm and 6:00 am.