Gridley Road Rehabilitation Project

 
 

OE provided construction management and inspection services to the City of Santa Fe Springs on the Gridley Road Rehabilitation Project. The project limits were on Gridley Road between Clarkman Street and Davenrich Street. This 1/2 mile stretch was in a residential area, and careful attention was paid to ensure that the residents were minimally affected. The rehabilitation method employed cement treated base. This method mitigates any sub-base issues and provides a supporting base for the new asphalt pavement. Additionally, cement treated base allows traffic to utilize the roadway sooner, which meant that residents were able to gain access to their home in the quickest time possible. The Gridley Road Rehabilitation Project also included the construction of concrete curb and gutter and replacing access ramps to gain ADA compliance.