School Wood Drive Street Widening Project

 
 

OE was responsible for preparing design plans and specifications & engineer’s estimate (PS&E) to the City of La Habra on this high-profile project. The work involved removal of a rolled curb along Schoolwood Drive and widening the street seven feet to the west. The project also entailed installing conventional type curb and gutter and sidewalk. The design effort had to be coordinated with the La Habra School District and the City of La Habra. The children attending Imperial Middle School and the adjacent Las Positas Elementary School use Schoolwood Drive to walk to school while the parents used it as a  drop-off and pick-up zone.