Rosini & Rosewood Phase II

 
 

OE provided design engineering, construction management and inspection services to the City of Commerce on the Rosini & Rosewood Neighborhood Roadway Rehabilitation project. This politically-sensitive residential reconstruction project took place just south of I-5 and north of heavily traveled Washington Boulevard. During the design, our team conducted a thorough pavement investigation, which included an inventory of potential parkway improvements which were prioritized to ensure maximum utilization of the City's available budget. Our team presented several options to the City with a cost-benefit analysis. This heavily deteriorated roadway was reconstructed utilizing Full-Depth Reclamation, 14" of roadway was excavated, and a 10" section was treated with cement. The construction entailed replacing curb and gutter and sidewalk, as well as ensuring that ramps met ADA standards.