Redondo Beach Staff Augmentation

OE provided staff augmentation services to the City of Redondo Beach for a contract not to exceed $225,000. OE provided an Associate Engineer to the City of Redondo Beach in order to fill the need for a temporary vacancy. The Engineer provided the City with various tasks including design engineering, plan preparation, specification preparation, plan-checking services, inspection services, construction management & support,  peer review, and engineering counter work. Here is a partial list of projects that OE’s Project/Associate Engineer worked on:

- (2) Residential Streets Projects
- Citywide Curb Ramp Improvements Project
- Artesia/Aviation Northbound Right-Turn Lane Project
- PCH Arterial Improvement Study Project
- PCH/Torrance Northbound Right-Turn Lane Project
- Improvements at 190th Street & Beryl Street Project
- Aviation Boulevard Resurfacing Project
- Avenida Del Norte & Riviera Parking Lot Resurfacing
- Citywide Sewer Traffic Control Plans
- Del Amo Street Rehabilitation Project

- Electrical Trench & Conduit Installation & Traffic Control     Plans
- Goodman Avenue Speed Cushions Project 
- Inglewood at Manhattan Beach Blvd. SB Right-Turn 
  Lane Project
- Inspection Services for 1715 Via El Prado Project
- Marine Avenue Field of Vision Exhibit
- Palos Verdes Westbound Right-Turn Lane at PCH
- PCH & Torrance Boulevard Widening – Plan Check
- Waterfront Revitalization Project