Maidstone Watermain Project
OE provided inspection services to replace a watermain in Maidstone Avenue, from Alondra Boulevard to 166th Street and from Flallon Avenue to Alora Avenue. The scope included installing 6,500 LF of 8-inch ductile iron pipes (DIP), 27 gate valves, 125 new house connections with meters, and repaving excavated areas. OE's Inspector coordinated weekly safety meetings and coordinated with affected residents to allow the contractor to shut off water for short periods of time. The project was phased, and required heavy supervision to ensure resident satisfaction throughout the construction timeline.