Hermosa Avenue Pavement Rehabilitation Project
OE provided inspection services to the City of Rancho Cucamonga on the Hermosa Avenue Pavement Rehabilitation project. The project limits were from Main Street to Arrow Route. The project included an Asphalt Rubber Hot Mix (ARHM) overlay, asphalt concrete pavement, cold plane, adjusting manholes, and water valve covers. It also included installing traffic signal detector loops at Hermosa and Arrow, and we installed another set of traffic signal detector loops at Feron Blvd. and Hermosa Ave. This project also required traffic control.