Hacienda Road & East Road Stimulus Project
OE provided design, construction management, and inspection services for 4.16 miles of roadway. The project was funded by the ARRA, and spanned Hacienda Road, from the north city limits to Avocado, and East Road from Hacienda Road to Fullerton Road. The scope included roadway rehabilitation with areas being Removed & Replaced with full structural section 16-inches deep and grind & overlay in other areas, providing erosion control by re-compacting an adjacent slope and installing rip rap, installing metal guard railing and traffic loops, and improving drainage with new rolled curb and gutter, v-ditch installations, and relocating several existing utilities. With the roads providing single lane access to and from adjacent neighborhoods, careful attention was given to project phasing and traffic control design. During the bid and construction phases, OE ensured the project adhered to the Caltrans Local Assistance Procedures Manual, and took care of all Caltrans paperwork required for E-76 approval and closeout. E-76 permits set strict documentation and submittal schedule requirements for the pre-bid phase, as well as strict labor compliance documentation requirements for closing out a project to ensure funding remains available.