Hacienda Dr. Water Main Reconstruction Project

OE provided design engineering services to the City of La Habra for this 800’ long 8” water main.  The scope of work included re-aligning the new water main in order to keep the existing water main in service. The proposed water main was upgraded from an old and corroded 6” ductile iron to an 8” HDPE pipe. OE designed the layout for the new water main, valve locations, and tie-ins to best keep the existing water main in service for the residents that this main services. In addition to the water main, OE designed the reconstruction of the existing pavement surface.  This project was an emergency repair project and OE met the Cities expedited schedule to get this project complete before any additional issues came up on this water main.