LH-Heights-Seal.jpg

Fullerton Road Improvements

Beginning At Skyline Dr. and Running Along 1,000 feet East of East Rd.

from:

JANUARY 2018

to:

              FEBRUARY 2018                


 

This Project Will Involve:

 42,500 Square Feet of Asphalt Grinding
 650 Tons of Asphalt Overlay
 Storm Drain Basin Improvement

 

- DETAILED PROJECT DESCRIPTION -

Fullerton Road will soon experience pavement improvements from Skyline Drive to 1,000 feet east of East Road. This project will replace the weathered and failing asphalt concrete surface with a new smoother asphalt concrete surface. Residents will have full access to their homes and driveways at all times. Temporary delays in access may occur as material is placed and the crews are working near specific driveways. Delays are anticipated during construction so please use an alternate route if possible.     

 

- HOME ACCESS -

Generally, every effort will be made to maintain access to your business. At times, access may be limited for safety reasons or during pavement operations. Fullerton Road may be partially closed for a limited time. 

- DRIVEWAY ACCESS -

There may be times where it is necessary to close driveways for short periods of time. You will be notified in advance when these closures are required. 

- LANE CLOSURES -

Lane restrictions will happen during excavation and paving operations. Traffic control will be maintained at all times, and notice of lane closures will be distributed in advance. 

- WORKING/CONSTRUCTION HOURS -

Construction hours are from 7:30 am to 4:30 pm, Monday through Friday (excluding holidays). These hours are subject to change. You will be notified two weeks in advance if there are any changes to the schedule which may help us expedite the completion of this project. 

INTERACTIVE MAP

View map for interactive project information & location.

(To see project details about your street click the enlarge icon " [ ] " on the map below, then click on your street.)

 

Dial The Number Below Any Time for More Information and Updates

1 - 855 - MYCITY5

( 1 - 855 - 692 - 4895 )

 

- Project Team -

Justin Smeets

Construction Manager

Brain French

Construction Inspector

All American Asphalt

Contractor

John Manly

Superintendent

brought to you by