Bellflower Blvd. & Woodruff Ave. Rehabilitation (STPL)

 
 

OE provided design engineering and Federal Aid Documentation services to the City of Bellflower on this Federal Surface Transportation Program Local (STPL) funds project. This project covered approximately 3,500 LF of arterial roadway rehabilitation design. The rehabilitation design varied, and included full width and variable depth grind and ARHM overlay, localized full-depth reconstruction, PCC sidewalk, curb & gutter, driveway and curb ramp replacement and traffic striping design. The project also required E-76 Construction Authorization Package for Caltrans Approval. OE expedited the design schedule to meet E-76 requirements, and ensured all other funding requirements and deadlines were met to secure funding. OE also conducted extensive utility coordination and research, ensuring that conflicts were not encountered during the construction phase.