190th St. Pavement Rehabilitation Project
OE provided design engineering services to the City of Torrance on the 190th Street Pavement Rehabilitation Project. The project included preparing PS&E, including a plan and profile, traffic striping and signing plans, traffic control, phasing plans and detour plans. The scope of work consisted of rehabilitating approximately 3,500 LF of roadway on 190th Street, Hawthorne Boulevard to Prairie Avenue. 190th St. is a major 6 lane arterial that runs parallel to the I-405 freeway and is a major gateway to the South Bay. OE’s design included portions of grind and overlay, full depth reconstruction, AC cap, removal and replacement of curb gutter, and sidewalk, installing ADA-compliant ramps, and installing video detection systems at intersections, as well as various related improvements. OE actively processed submittals through all reviewing agencies and ensured the project design proceeded smoothly and successfully.